Rotating & Static Equipment Installation

BTS service procedure is set to follow general requirements for the installation of equipment on the construction site. In accordance with the Project specifications and other applicable codes & standards, such as safety, quality, quantity and time lines.

As cranes and trailers are crucial parts of the installation work, BTS does also take care of the planning process. BTS provide lifting- and rigging plan, plot plan and load test certificate, if applicable.

Rotating 11
Rotating Equipment Installation
Rotating 11
Rotating Equipment Installation
previous arrow
next arrow
Rotating 11
Static Equipment Installation
Rotating 11
Static Equipment Installation
previous arrow
next arrow

Brillance Technical Service and Solution Co.,Ltd.

32/3 M.1 T.Banchang A.banchang Rayong 21130

Tel : +66 3801-8773  Email : Brillance.2017@btsc.co.th

Brillance Technical Service and Solution Co.,Ltd.

32/3 M.1 T.Banchang A.Banchang Rayong 21130

Tel : +66 3801-8773  Email : Brillance.2017@btsc.co.th